Popular Articles

Sugar firms to help calm prices
Producers meet agriculture minister, agree to increase supply of the commodity

Share price volatility inversely proportional to IPO grade
Volatility in share price of a company is inversely proportional to the grade assigned to its initial public offer, as firms with high grade show relatively less fluctuations in share prices, a study said.

News of the day

60% of services sector units in rural India: Survey
Sixty per cent of the country’s services sector enterprises are in rural areas, according to a report by the National Sample Survey Organisation (NSSO). The report is based on the 63rd round of survey by NSSO to estimate the economic characteristics of services sector enterprises in India in 2006-07.
Management

Tata Power in position to add 30,000 more consumers by March

Tata Power Company today said it will be able to supply electricity to an additional 30,000 consumers in the city by March next year. - Tata Power with Norway firm to dev hydropower project - Tata Power net down 28% - 4,000 Mumbaikars may switch off R-Infra - R-Infra tells EGoM to stop RIL marketing margin - Reliance Infra wants EGoM to decide on marketing margin on D6 gas - ADAG firms" shares released from pledge The private sector utility will begin power supplies in a month to 4,000 more consumers in Mumbai who have changed over from Reliance Infrastructure"s distribution network. "So far, we have interest from about 30,000 consumers. We believe, by March, we will be in a position to transfer all of them. We expect more consumption (additional load) by 30 Mw by March 2010," Tata Power Company"s Executive Director (Finance) S Ramakrishnan told reporters here. Tata Power has so far received and processed 3,000 to 4,000 applications for a change-over to TPC"s distribution network from mainly residential consumers in Mumbai"s suburbs. "I think we have successfully processed applications of about 4,000 consumers. They will be given connections in a month"s time," he said. Tata Power"s current load across Mumbai stands at 400 Mw, which peaks at 477 Mw in summers. India"s largest private electricity producer presently supplies power to about 28,000 consumers in the metropolis. Between 40,000-50,000 consumers of Reliance Infrastructure have been waiting to switch-over to cheaper Tata Power for electricity connections over the past few months. The change-over process was delayed as the two firms differed over replacement of old meters of Reliance with new ones by Tata Power, meter-reading and wheeling charges. The Maharashtra Electricity Regulatory Commission (MERC), on October 15, provided an interim solution that said meters by Reliance would remain and that customers changing over to Tata Power would be billed as per those readings. Both Tata and R-Infra have been asked to provide change-over application forms at their respective consumer service centers and websites. The change-over process has to be completed within 30 days from receipt of a completed application by the new distribution licensee.


Add your comment:
Name:
Site address: http://
Your message:
Enter today\\\\'s date, 2 digits
(spam protection):